The Aluminium formwork born in the United States in 1962 has been widely used nowadays for global concrete structure in developed countries such as America and Canada newly industrialized countries such as Mexico, Brazil, Malaysia, South Korea and India after 50 years of development. Aluminium Formwork can be used more times compared with the traditional formwork. It is light with the average wight of 23 - 27 kg/m2, convenient to use and easy to install, thus saving the labor cost and shortening the working period. Meanwhile it makes the concrete surface flat smooth basically reaching the demand of veneer and water coagulation, which greatly improves the project quality.
![]()
√ Short construct period in average 4-5days/floor
√ 300 reuse times, reduce average project cost
√ Easy to use, high efficiency, don’t need workers with high specialized skills
√ Good stability, high bearing up to 60KN/M2
√ High project quality, smooth surface, no need plaster process
√ No construction trash and noise, reduce potential safety risk
√ 80% standard components, can be reused in next project
√ High recycle value, average value up to US$60/M2
√ Eco-friendly, comply with environmental protection requirements
√ Simple supporting system, make the site wide space
Categories
Aluminum Formwork
Euro Formwork
Plywood Formwork
Materials
4.00 mm A6061-T6
Steel+15mm Plywood
12-18mm Film Faced Plywood
Specifications
600mmx2400mmx65mm
600mmx1200mmx65mm
600mmx1200mmx65mm
1220mmx2440mmx(12-18)mm
Weight
23-27KG/M2
35-40KG/M2
10.5KG/M2
Reuse Times
300times
50times
8times
Loading
60KN/M2
30KN/M2
30KN/M2
Construction Period
4-5days
8days
10days
Assembly
Easy
Hard
Difficult
Disassembly
36h/floor
72h/floor
168h/floor
Quality of Concrete Surface
Flat & Smooth Surface
Flat Surface
Rough Surface
Alv aluminum formwork is an early removing system with the working period of 5 days. After setting of the concrete within 24 hours, the set of panels can be removed for the repetitive use for the next floor thereby achieving a short construction period and a high quality concrete structure.
Description/Days
1
2
3
4
5
Structural lines and installation of reinforcing bars
M&E&Plumbing installation
Dismantling last floor wall panel
Installation of wall panels
Concrete level survey
Dismantling last floor beam panel
Installation of the beam panel
Installation of Slab panels
Installation of nonstandard panel and reinforcing wall and column
Installation of reinforcing bars on the slab panels before casting
the concrete
M&E&Plumbing of Slab
Concrete level survey, casting and curing of the concrete
Sequence NO.1
Paint oil before assembly
Sequence NO.2
Fix Outer Corner to External Wall Corner Panel by round pin and wedge.
Sequence NO.3
Fix Inner Corner to the Internal Wall Panels by round pin and wedge.
Sequence NO.4
Repeat Sequence NO.3 to complete the assembly of both the Internal and External Wall Panels.
Sequence NO.5
Install Slab Conner on the top portion of the Wall Panels with round pin & wedge.
Sequence NO.6
Combine MB, EB and Prop by joint bar with long pin and wedge at the bottom section of the beams.
Sequence NO.7
Repeat Sequence NO.6 and assemble all the Slab Panels from the corner section of the slabs.
Sequence NO.8
Fix Kicker Panels to External Wall Panels to raise the panels up to appropriate height.
Sequence NO.9
Make a numbering sequence to mark each panel with color identification scheme for easy installation of next levels.
Sequence NO.10
Pour concrete into the forms.
Sequence NO.1
After 12 hours, remove the Internal Wall Panels by knocking out the wedges and pins.
Sequence NO.2
Remove the External Wall Panels.
Sequence NO.3
After 36 hours, disassemble the Slab Panels by removing the long pins and wedges.
Sequence NO.4
Remove the middle and end beams while remaining the props undisturbed.
Sequence NO.5
Strip the Slab Panels.
Sequence NO.6
Strip the Slab Corner.
Sequence NO.7
Pull out all Flat Tie by using disassemble tool.
Remove the PVC Sleeves with the Tie Bar Extractor.
Sequence NO.8
Remove the Props and Prop Heads after passing cube tests.