Thehigh-rise buildingconstruction has same identical floors. The duration of construction greatly affects the construction cost. Selection of best formwork system gives best result in cost saving.Alv aluminum formwork solutionsis specifically designed to allow the rapid construction of multiple unit projects - high rise buildings.
Aluminum formwork system components need to be designed according to the characteristics of the floor. Approximately80%of the modules in the aluminum formwork system can be recycled in multiple projects, while the remaining20%can only be recycled in a class of standard floors, so the aluminum formwork system is suitable for high rise concrete construction with high levels of standardization.
Featured by the simplicity of use, optimum productivity and super finished project quality, Alv provides the construction of high rise buildings with betterformwork selection.
High Efficiency, cost Saving: | High Recycling rate: | High Project quality: | Good Construction environment: |
1:Short construction period:4-5days/floor
2:Easy to use, don’t need workers with high specialized skills. |
1:300 reuse times, reduce average project cost 2: 80%standard components can be used in next project |
1:Good stability,high bearing up to60KN/M2 2:Smooth surface, no need plaster process |
1:No construction trash and noise, reduce potential safety risk 2:Simple supporting system, make the site wide space |
Customer consulting: Project assessment, preliminary communication
Technical support: Construction drawing analysis, output specifications of formwork drawings
Customer Consulting: Project assessment, preliminary communication
Confirm Order: Customer analysis quotation, 30% payment for deposit
Production process: Standardized production according to strict designs
QC System: Inspection during and after production
Test assembly: Assemble the formwork in warehouse before delivery
Barcode: Mark the formwork components before dismantlement and delivery
FAE: After sales support, provide technical training or on-site installation service
Structural lines and installation of reinforcing bars
M&E&Plumbing installation
Dismantling last floor wall panel
Concrete level survey
Installation of wall panels
Dismantling last floor beam panel
Installation of the beam panel
Installation of Slab panels
Installation of nonstandard panel and reinforcing wall and column
Installation of reinforcing bars on the slab panels before casting the concrete
M&E&Plumbing of Slab
Casting and curing of the concrete